User Tools

Site Tools


handover:aug020

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
handover:aug020 [2016/01/11 05:47]
Jesse Swan
handover:aug020 [2016/01/11 21:43]
Jesse Swan
Line 6: Line 6:
  
   * UT0630 Experiment started OK (JS)   * UT0630 Experiment started OK (JS)
 +
 +
 **Katherine** **Katherine**
  
 Module: HOB+0128, 0.77 GB Module: HOB+0128, 0.77 GB
-  * UT0630 Experiment started ​OK (JS)+  * UT0630 Experiment started ​but with large clock offsets ​(JMC) 
 +  * UT0632 Experiment halted to reconfigure DBBC.  
 +  * UT0638, schedule resumed, UT0652 after problems with checkmk5 procedure but clock drifts continue.  
 +  * 11:44 UT - Schedule stopped as delay differences kept drifting, with DBBC reset achieving nothing. (Ellen)
  
 **Yarragadee** **Yarragadee**
/home/www/auscope/opswiki/data/pages/handover/aug020.txt · Last modified: 2016/01/12 01:51 by Jesse Swan