This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
handover:aug020 [2016/01/11 05:47] Jesse Swan |
handover:aug020 [2016/01/12 01:51] Jesse Swan |
||
---|---|---|---|
Line 6: | Line 6: | ||
* UT0630 Experiment started OK (JS) | * UT0630 Experiment started OK (JS) | ||
+ | |||
+ | |||
**Katherine** | **Katherine** | ||
Module: HOB+0128, 0.77 GB | Module: HOB+0128, 0.77 GB | ||
- | * UT0630 Experiment started OK (JS) | + | * UT0630 Experiment started but with large clock offsets (JMC) |
+ | * UT0632 Experiment halted to reconfigure DBBC. | ||
+ | * UT0638, schedule resumed, UT0652 after problems with checkmk5 procedure but clock drifts continue. | ||
+ | * 11:44 UT - Schedule stopped as delay differences kept drifting, with DBBC reset achieving nothing. (Ellen) | ||
+ | * UT2310 Halted for DBBC reset, delay differences still drifting (Bryn) | ||
+ | * UT0004 Experiment Halted, delay differences drifting faster. | ||
**Yarragadee** | **Yarragadee** |