This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Last revision Both sides next revision | ||
handover:aum008 [2018/09/13 02:20] Jamie McCallum |
handover:aum008 [2018/09/13 11:32] Atifur R. Khan |
||
---|---|---|---|
Line 10: | Line 10: | ||
* 0104 - resynched DBBC/Mark5. Error linked to work in the maser room. (JMc) | * 0104 - resynched DBBC/Mark5. Error linked to work in the maser room. (JMc) | ||
* 0218 - another fmset | * 0218 - another fmset | ||
+ | * 0700 - Many clock breaks in the interim(JMc) | ||
+ | * ~10:30 - New AC is now in operation, maser room should be temperature stabilised within a few hours. (JMc) | ||
+ | * 10:59 UT reconfigured the dbbc. Affected scans: 256-1059, 256-1101 (Simin) | ||
+ | * 11:30 UT ALARM: error fl -1 previous source in this schedule not reached before new source was commanded. (Simin) | ||
Yarragadee 12m | Yarragadee 12m |