This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
handover:aust69 [2014/12/12 06:35] Imogen Jones |
handover:aust69 [2014/12/13 00:55] cjordan |
||
---|---|---|---|
Line 3: | Line 3: | ||
Hobart 12m: | Hobart 12m: | ||
- | + | * Disk VSN: HOB+1006 | |
- | Disk VSN: HOB+1006 | + | * Data volume at beginning: ~1886 GB |
- | + | ||
- | Data volume at beginning: 0GB | + | |
Katherine 12m: | Katherine 12m: | ||
+ | * Disk VSN: HOB+0093 | ||
+ | * Data volume at beginning: 0GB | ||
+ | * Observations started as planned, but the mk5 was not yet synced. The first good scan starts at 00:07:20 (0826-373) (Chris) | ||
+ | * 00:53UT: Observations are about 8 GB behind predicted schedule amount. This is not quite the same as how much was missed at the start, but only within 5 GB. (Chris) | ||
- | Disk VSN: HOB+0096 | + | Yarragadee 12m: |
+ | * Disk VSN: HOB+0119 | ||
+ | * Data volume at beginning: 0GB | ||
- | Data volume at beginning: 0GB | + | 23:50UT: UPS problems at Ke were experienced before the start of the schedule. No pointing or fringe checks were performed at any station. (Chris) |
- | Yarragadee 12m: | ||
- | |||
- | Disk VSN: | ||
- | Data volume at beginning: | ||
{{tag>}} | {{tag>}} | ||
~~DISCUSSION~~ | ~~DISCUSSION~~ | ||
- |