This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Last revision Both sides next revision | ||
handover:crds81 [2016/01/28 07:31] Tiege McCarthy |
handover:crds81 [2016/01/28 13:38] Tiege McCarthy |
||
---|---|---|---|
Line 7: | Line 7: | ||
* 17:20 Drivepc restarted in time for experiment (JS) | * 17:20 Drivepc restarted in time for experiment (JS) | ||
* 17:20 70K stage at 110, 40k stage at 80, pressure at 4.9 will need vacuuming in the morning (JS) | * 17:20 70K stage at 110, 40k stage at 80, pressure at 4.9 will need vacuuming in the morning (JS) | ||
- | * 07:22 UT - Jim reported that the received had been cooled. The stages are currently: 70K at 79 and 20K at 59. (Ellen) | + | * 07:22 UT - Jim reported that the received had been cooled. The stages are currently: 79 at 70K and 59 at 20K. (Ellen) |
* 07:25 UT - Can't connect to newsmerd on monica so I can't check the He supply pressure. (Ellen) | * 07:25 UT - Can't connect to newsmerd on monica so I can't check the He supply pressure. (Ellen) | ||
+ | * 09:39 UT - S/X receiver stages are now at 67 and 53. (Ellen) | ||
+ | * 09:40 UT - Tsys values in bands 01 - 08 are approx 110. This is probably due to the current storm. (Ellen) | ||
+ | * 11:30 UT - Tsys values are back to normal. (Ellen) | ||
+ | * 13:36 UT - Status monitor reporting date as 1969.293.01.48 UT, schedule appears unaffected. (Bryn) | ||
- | **Hobart** | + | **Hobart 12** |
Module: HOB+0075, 6264 GB | Module: HOB+0075, 6264 GB | ||
* 17:39 UT - Experiment started OK (JS) | * 17:39 UT - Experiment started OK (JS) | ||
+ | * 09:40 UT - Tsys values all way too high, mostly consistently around 200. This is probably due to the current storm, although Ho system temps are only up to ~110. (Ellen) | ||
+ | * 11:33 UT - X-band has cooled to normal temps but S-band is still too high. (Ellen) | ||
**Katherine** | **Katherine** |