This shows you the differences between two versions of the page.
Next revision | Previous revision Next revision Both sides next revision | ||
handover:dynamic_schedule_ds275 [2016/10/01 13:42] Ellen Manning |
handover:dynamic_schedule_ds275 [2016/10/02 07:21] Ellen Manning |
||
---|---|---|---|
Line 6: | Line 6: | ||
* A few scans still slewing during scans. (Ellen) | * A few scans still slewing during scans. (Ellen) | ||
+ | * 07:18:54 WARNING: error fl -1 previous source in this schedule not reached before new source was commanded | ||
+ | |||
**Katherine** | **Katherine** | ||
- | Module: ULVBI-29, unknown starting disc position | + | Module: ULVBI-29, unknown starting disc position. USN-0062 (second disk) 0.000 GB |
* Module filled up so schedule stopped until someone can put another module in. (Ellen) | * Module filled up so schedule stopped until someone can put another module in. (Ellen) | ||
* According to the logs, the last scan before it cut out was 275-0459. (Ellen) | * According to the logs, the last scan before it cut out was 275-0459. (Ellen) | ||
+ | * 02:00 UT - Schedule resumed, first scan 276-0201 (Ross) | ||
+ | * 02:11 UT - Large offset between formatter and maser delays, but it is stable (Ross) | ||
**Yarragadee** | **Yarragadee** | ||
Line 19: | Line 23: | ||
* A few scans still slewing during scans. (Ellen) | * A few scans still slewing during scans. (Ellen) | ||
+ | * 13:49 UT - Tsys bands 09, 10, 12, 13 way too high. (Ellen) | ||
{{tag>}} | {{tag>}} | ||
~~DISCUSSION~~ | ~~DISCUSSION~~ |