This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
handover:dynamic_schedule_ds275 [2016/10/02 01:56] Ellen Manning |
handover:dynamic_schedule_ds275 [2016/10/02 07:21] Ellen Manning |
||
---|---|---|---|
Line 6: | Line 6: | ||
* A few scans still slewing during scans. (Ellen) | * A few scans still slewing during scans. (Ellen) | ||
+ | * 07:18:54 WARNING: error fl -1 previous source in this schedule not reached before new source was commanded | ||
+ | |||
**Katherine** | **Katherine** | ||
Line 13: | Line 15: | ||
* Module filled up so schedule stopped until someone can put another module in. (Ellen) | * Module filled up so schedule stopped until someone can put another module in. (Ellen) | ||
* According to the logs, the last scan before it cut out was 275-0459. (Ellen) | * According to the logs, the last scan before it cut out was 275-0459. (Ellen) | ||
- | * 01:56 UT - Schedule resumed, first scan 276- (Ross) | + | * 02:00 UT - Schedule resumed, first scan 276-0201 (Ross) |
+ | * 02:11 UT - Large offset between formatter and maser delays, but it is stable (Ross) | ||
**Yarragadee** | **Yarragadee** |