This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
handover:hob006 [2016/10/21 19:17] Jim Lovell |
handover:hob006 [2016/10/21 22:03] Jim Lovell |
||
---|---|---|---|
Line 1: | Line 1: | ||
====== HOB006 ====== | ====== HOB006 ====== | ||
+ | |||
+ | When the hydraulics at Ho failed the following error was in the log monitor but was not setting off an alarm so Lucas wasn't woken up for it. It is not listed in the alarm_actions file | ||
+ | |||
+ | WARNING: error fl -1 previous source in this schedule not reached before new source was commanded | ||
+ | |||
**Hobart 26m** | **Hobart 26m** | ||
Line 6: | Line 11: | ||
* Experiment started late, GPIB device continually timed out whilst many errors ensued with control and equip files (Lucas). | * Experiment started late, GPIB device continually timed out whilst many errors ensued with control and equip files (Lucas). | ||
+ | * Turns out experiment was being incorrectly drudged due to unique setup (mk5/dbbc). Jamie manually re-drudged and setupxx worked correctly. First good scan 295-2040 (Lucas). | ||
+ | * Still getting delay difference changing due to GPIB device timeout. | ||
+ | * Update, as of 295-2052 after repeated "counter" commands it has fixed itself. Monitoring. (Lucas). | ||
+ | * I think there is a hydraulics fault. The Live page keeps saying to and keep getting command 'previous source in shced not reached before new source was commanded' (Lucas). | ||
Line 14: | Line 23: | ||
* Experiment Started OK (Lucas). | * Experiment Started OK (Lucas). | ||
+ | * Schedule halted whilst 26m was down. All scans missed **between** 295-1911 and 295-2016 - ~125 GB missing (Lucas). | ||