This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
handover:hob006 [2016/10/21 22:03] Jim Lovell |
handover:hob006 [2016/10/22 01:06] Jim Lovell |
||
---|---|---|---|
Line 14: | Line 14: | ||
* Still getting delay difference changing due to GPIB device timeout. | * Still getting delay difference changing due to GPIB device timeout. | ||
* Update, as of 295-2052 after repeated "counter" commands it has fixed itself. Monitoring. (Lucas). | * Update, as of 295-2052 after repeated "counter" commands it has fixed itself. Monitoring. (Lucas). | ||
- | * I think there is a hydraulics fault. The Live page keeps saying to and keep getting command 'previous source in shced not reached before new source was commanded' (Lucas). | + | * I think there is a hydraulics fault. The Live page keeps saying to and keep getting command 'previous source in sched not reached before new source was commanded' (Lucas). |
+ | * Hydraulics fault was caused by circuit break as the motor wasn't covered and water got in. Collaborative effort of Eric and Brett solved the problem. (Lucas). | ||
+ | * GPIB device continues to time-out, however delay difference is still stable and < 0.3. Counters are being monitored on rack camera to make sure that severe drifts don't occur whilst Eric investigates. (Lucas). | ||
+ | * 23:50 UT - schedule resumed. First scan 295-2351. GPIB still a problem though, reporting massive delay differences every scan. Clkoff value looks reasonable. (Ellen) | ||
+ | * 01:04 UT - Eric has reset the GPID device and it is still a problem. (Ellen) | ||