This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Last revision Both sides next revision | ||
handover:r1708 [2015/10/06 08:40] David Horsley |
handover:r1708 [2015/10/06 13:42] David Horsley |
||
---|---|---|---|
Line 15: | Line 15: | ||
* 08:00 UT Mark VI formatter time inconsistent with DAC time (lagging by 1 second), has been corrected for future scans/experiments (Ross) | * 08:00 UT Mark VI formatter time inconsistent with DAC time (lagging by 1 second), has been corrected for future scans/experiments (Ross) | ||
* 08:00 UT Mark VI IF channels 03 and 09 showing error lights, problem has been resolved for future scans/experiments (Ross) | * 08:00 UT Mark VI IF channels 03 and 09 showing error lights, problem has been resolved for future scans/experiments (Ross) | ||
+ | * 13:38 UT - Schedule resumed after wind died down. First scan 279-1346 at disc pos 418.4 GB. (Ellen) | ||
**Katherine** | **Katherine** | ||
Line 27: | Line 28: | ||
* 1700UT - Experiment started okay (JS) | * 1700UT - Experiment started okay (JS) | ||
+ | * 13:26 UT - Disc pos is over 100 GB behind the schedule. I can't find any explanation for this. (Ellen) | ||
{{tag>}} | {{tag>}} |