This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
handover:r1740 [2016/05/17 21:59] Bryn Emptage |
handover:r1740 [2016/05/18 02:59] Warren Hankey |
||
---|---|---|---|
Line 8: | Line 8: | ||
17:00:10 UT | 17:00:10 UT | ||
2016.138.17:00:10 WARNING: No PCFS activity for 0.1 minutes. | 2016.138.17:00:10 WARNING: No PCFS activity for 0.1 minutes. | ||
+ | |||
2016.138.17:00:10 Check VNC session to see if Field System software is running | 2016.138.17:00:10 Check VNC session to see if Field System software is running | ||
+ | |||
2016.138.17:00:10 Check network connection. | 2016.138.17:00:10 Check network connection. | ||
Line 14: | Line 16: | ||
This lead to a new error: (e.g) | This lead to a new error: (e.g) | ||
+ | |||
2016.138.21:52:35.28?ERROR qk -211 Tsys value for device eu overflowed or was less than zero. | 2016.138.21:52:35.28?ERROR qk -211 Tsys value for device eu overflowed or was less than zero. | ||
+ | |||
2016.138.21:52:39.19?ERROR ib -10 ibcon initialization failed, gpib devices inaccessible. | 2016.138.21:52:39.19?ERROR ib -10 ibcon initialization failed, gpib devices inaccessible. | ||
Line 25: | Line 29: | ||
All scans before missed. (Lucas) | All scans before missed. (Lucas) | ||
+ | |||
+ | * 23:50 UT: Manually power cycled GPIB to try and fix error ib -10 - Talk light was constantly on (possible communication jam). After power cycle - talk light is no longer constantly on. Error persists. (Bryn) | ||
+ | * 02:06 UT: Restarted fs to try fix error ib -10. //Missed scans 139-0212 and 139-0217//. Unsuccessful - Will reboot pcfs during next gap in schedule. (Bryn) | ||
+ | * 02:37 UT: Rebooted pcfs. (Bryn) | ||
+ | * 02:50 UT: error ib -10 fixed, errors with dbbc communication - cycling power. (Bryn) | ||