This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
handover:r4682 [2015/04/10 05:33] Imogen Jones |
handover:r4682 [2015/04/10 12:58] liza |
||
---|---|---|---|
Line 1: | Line 1: | ||
- | |||
- | <note important>**Achtung! R1 TRANSFER IN PROGRESS! MONITORING REQUIRED!**</note> | ||
- | R1 monitoring instructions: [[operations:monitoring.ivs.etransfer|operations:monitoring.ivs.etransfer]] | ||
- | |||
===== R4682 ===== | ===== R4682 ===== | ||
Line 14: | Line 10: | ||
* 18:30 UT - Experiment started OK (vk) | * 18:30 UT - Experiment started OK (vk) | ||
* 05:15UT - clock drift set of alarm. Delay was fine at 04:59UT, but drifted quickly (Imogen) | * 05:15UT - clock drift set of alarm. Delay was fine at 04:59UT, but drifted quickly (Imogen) | ||
- | * 05:18UT - clock drifted very quickly, halted schedule, reconfigured DBBC, (Imogen) | + | * 05:18UT - clock drifted very quickly, halted schedule, reconfigured DBBC, restarted schedule 05:33UT, missed scans 100-0524, 100-0528b, 100-0531b, (Imogen) |
+ | * RFI peaks in two last S-band channels, high Tsys in both S and X bands (Liza) | ||
**Katherine 12m:** | **Katherine 12m:** |