This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
handover:rd1510 [2015/12/02 01:33] Ross Turner |
handover:rd1510 [2015/12/02 02:36] Ross Turner |
||
---|---|---|---|
Line 11: | Line 11: | ||
* 22:40UT There was a power outage at Mt Pleasant which caused everything to crash. The generator is now operating everything, schedule was restarted at 22:49UT. (Imogen) | * 22:40UT There was a power outage at Mt Pleasant which caused everything to crash. The generator is now operating everything, schedule was restarted at 22:49UT. (Imogen) | ||
* 01:30UT Wind stow, schedule halted. While the antenna is in wind stow, Brett and Eric are fixing a problem with receiver communication. (Imogen) | * 01:30UT Wind stow, schedule halted. While the antenna is in wind stow, Brett and Eric are fixing a problem with receiver communication. (Imogen) | ||
+ | * 02:36UT Schedule restarted after wind had died down and receiver communication problem fixed. (Imogen) | ||
{{tag>}} | {{tag>}} | ||
~~DISCUSSION~~ | ~~DISCUSSION~~ |