handover:rd1704 [2017/03/29 18:54] Warren Hankey |
handover:rd1704 [2017/03/29 18:55] Warren Hankey |
||
---|---|---|---|
Line 9: | Line 9: | ||
* Wrong equip.ctl file was loaded to start, needed to fix. | * Wrong equip.ctl file was loaded to start, needed to fix. | ||
* time-outs to vc rack when running setup8f, required manual power cycle at Mt. P + reset of tty distributor (middle left of VC rack). (Bryn) | * time-outs to vc rack when running setup8f, required manual power cycle at Mt. P + reset of tty distributor (middle left of VC rack). (Bryn) | ||
+ | * Fixed red lights on first VC of third row with vc15=200,2 (LO Lock light) and vc15=alarm (alarm light). | ||
* 18:48UT Experiment started late due to issues with formatter time, field system time and Mark IV rack. (Bryn) | * 18:48UT Experiment started late due to issues with formatter time, field system time and Mark IV rack. (Bryn) | ||