This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
handover:start [2018/12/12 20:41] Tiege McCarthy |
handover:start [2021/04/21 13:49] (current) Jasper Edwards |
||
---|---|---|---|
Line 1: | Line 1: | ||
+ | ====== AUA075 ====== | ||
- | ====== RD1810 ====== | + | **Hobart 12m** |
+ | - Field system crashed - noticed at approximately 20:30 Hobart time, 10:30 UTC. Prad restarted experiment but Telescope was stuck in SLEW and wasn't changing elevation/azimuth. Warren called and restarted system again. System function normal by 23:00 hobart/ 13:00 UTC. (Jasper) | ||
- | **Hobart 26m** | ||
- | Disk VSN: USN-0102/6000/1024. Data volume at the beginning 0 GB. | + | **All Stations (Yg, Hb, Ke)** |
- | * 1800 UT - Experiment started OK (Jay). | + | - Some of the checklists for stations had error comments made on them (when none was necessary) since operator was not aware of the idiosyncrasies of station systems. Warren overviewed systems and deemed them functional and satisfactory. (Jasper) |
- | * 0840 UT - Noticed system temperatures had not being recorded since setup so restarted dbbc. First usable scan is 345-0850b (Ross). | + | |
- | * At 13:16 UT - received error antenna communication software (antcn) problem. Halt the schedule. Received continuous Alarm: error f1 -1 previous source in this schedule not reached before new source was commanded. Reboot the antenna system . Missed scans 345-1320 till 345-1354 (mas) | + | |
- | + | ||
- | + | ||
- | **Yarragadee 12m** | + | |
- | + | ||
- | Disk VSN: USN-0150/4000. Data volume at the beginning 3.654 GB. | + | |
- | + | ||
- | * 1700 UT - Experiment started OK (Prad). | + |