This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
katherine_todo [2014/04/07 05:53] Jamie McCallum |
katherine_todo [2014/06/28 22:17] Brett Reid |
||
---|---|---|---|
Line 3: | Line 3: | ||
* Phase cal testing (temperature stabilisation? Bad filters?) | * Phase cal testing (temperature stabilisation? Bad filters?) | ||
* DBBC service - check cables, internal connections, bad boards) | * DBBC service - check cables, internal connections, bad boards) | ||
+ | * earthing of DBBC and MK5 units | ||
* DBBC cont cal - tune for ~2-5% CONT CAL, 5-10% pulsed CAL | * DBBC cont cal - tune for ~2-5% CONT CAL, 5-10% pulsed CAL | ||
- | * Y-factor tests - get all CAL factors via DBBC | + | * CONT CAL seems to be triggered when PULSED CAL is? Check wiring on spare board? |
+ | * Y-factor tests - get all CAL factors via DBBC. | ||
* control room temp sensors - MoniCA | * control room temp sensors - MoniCA | ||
* twister cable suspender | * twister cable suspender | ||
* fix UPS | * fix UPS | ||
* pedestal fan | * pedestal fan | ||
- | * webcam clean | + | * <del>webcam clean</del> |
+ | * Upgrade mk5-2ke | ||
+ | * Back up all PCs | ||
+ | * <del>Maser service.</del> | ||
* tidy ptz wiring | * tidy ptz wiring | ||
- | * clean all sky cam lens | + | * <del>clean all sky cam lens</del> |
* check for rodents in genset | * check for rodents in genset | ||
+ | * generator battery charger reduce electrolyte boiling | ||
* feed temp/press sensor | * feed temp/press sensor | ||
* weed control | * weed control | ||
* insect proofing of the hub | * insect proofing of the hub | ||
- | * pedestal base flange seal | + | * <del>pedestal base flange seal</del>, recoat with paving paint |
- | * grooves in concrete foundation to promote drainage | + | * <del>grooves in concrete foundation to promote drainage</del> |
* remove rust from container and paint | * remove rust from container and paint | ||
Line 34: | Line 40: | ||
* Site | * Site | ||
* <del>Remove rubbish</del> | * <del>Remove rubbish</del> | ||
+ | * weeding and mowing | ||
+ | * shelter above container | ||
* hardware | * hardware | ||
* <del>Confirm full set of spares</del>, record serial numbers | * <del>Confirm full set of spares</del>, record serial numbers | ||
Line 51: | Line 59: | ||
* <del>Determine gross pointing offsets and obtain a zeroth-order model (Jim)</del> | * <del>Determine gross pointing offsets and obtain a zeroth-order model (Jim)</del> | ||
* <del>Measure SEFD at all bands. Should be ~2500 Jy</del> | * <del>Measure SEFD at all bands. Should be ~2500 Jy</del> | ||
- | * Fringe check to Hobart | + | * <del>Fringe check to Hobart</del> |
* Software | * Software | ||
* Confirm PCFS can talk to: | * Confirm PCFS can talk to: | ||
Line 105: | Line 113: | ||
* Doors in Hub, <del>trim</del> and cutouts, <del>fit</del> | * Doors in Hub, <del>trim</del> and cutouts, <del>fit</del> | ||
* Rod and hook for retrieving fall arrester | * Rod and hook for retrieving fall arrester | ||
+ | * eye bolt for fall arrester | ||
* <del>Phase Cal xdB - Sband 1dB</del> | * <del>Phase Cal xdB - Sband 1dB</del> | ||
* UPS | * UPS | ||
* Maser battery PLL fault | * Maser battery PLL fault | ||
+ | * run a sych and 100MHz rg58 coax | ||
* Camera | * Camera | ||
* <del>Lightning arrestor</del> | * <del>Lightning arrestor</del> |