Line 3: Line 3:
     * Phase cal testing (temperature stabilisation?​ Bad filters?)     * Phase cal testing (temperature stabilisation?​ Bad filters?)
     * DBBC service - check cables, internal connections,​ bad boards)     * DBBC service - check cables, internal connections,​ bad boards)
 +    * earthing of DBBC and MK5 units
     * DBBC cont cal - tune for ~2-5% CONT CAL, 5-10% pulsed CAL     * DBBC cont cal - tune for ~2-5% CONT CAL, 5-10% pulsed CAL
-    ​* Y-factor tests - get all CAL factors via DBBC +        * CONT CAL seems to be triggered when PULSED CAL is? Check wiring on spare board? 
 +    ​* Y-factor tests - get all CAL factors via DBBC
     * control room temp sensors - MoniCA     * control room temp sensors - MoniCA
     * twister cable suspender     * twister cable suspender
     * fix UPS     * fix UPS
     * pedestal fan     * pedestal fan
-    * webcam clean+    * <del>webcam clean</​del>​ 
 +    * Upgrade mk5-2ke 
 +    * Back up all PCs 
 +    * <​del>​Maser service.</​del>​
     * tidy ptz wiring     * tidy ptz wiring
-    * clean all sky cam lens+    * <del>clean all sky cam lens</​del>​
     * check for rodents in genset     * check for rodents in genset
 +    * generator battery charger reduce electrolyte boiling
     * feed temp/press sensor     * feed temp/press sensor
     * weed control     * weed control
     * insect proofing of the hub     * insect proofing of the hub
-    * pedestal base flange seal +    * <del>pedestal base flange seal</​del>,​ recoat with paving paint 
-    * grooves in concrete foundation to promote drainage+    * <del>grooves in concrete foundation to promote drainage</​del>​
     * remove rust from container and paint     * remove rust from container and paint
  
Line 34: Line 40:
   * Site   * Site
     * <​del>​Remove rubbish</​del>​     * <​del>​Remove rubbish</​del>​
 +    * weeding and mowing
 +    * shelter above container
   * hardware   * hardware
     * <​del>​Confirm full set of spares</​del>,​ record serial numbers     * <​del>​Confirm full set of spares</​del>,​ record serial numbers
Line 51: Line 59:
       * <​del>​Determine gross pointing offsets and obtain a zeroth-order model (Jim)</​del>​       * <​del>​Determine gross pointing offsets and obtain a zeroth-order model (Jim)</​del>​
     * <​del>​Measure SEFD at all bands. Should be ~2500 Jy</​del>​     * <​del>​Measure SEFD at all bands. Should be ~2500 Jy</​del>​
-    * Fringe check to Hobart+    * <del>Fringe check to Hobart</​del>​
   * Software   * Software
     * Confirm PCFS can talk to:     * Confirm PCFS can talk to:
Line 105: Line 113:
       * Doors in Hub, <​del>​trim</​del>​ and cutouts, <​del>​fit</​del>​       * Doors in Hub, <​del>​trim</​del>​ and cutouts, <​del>​fit</​del>​
       * Rod and hook for retrieving fall arrester       * Rod and hook for retrieving fall arrester
 +      * eye bolt for fall arrester
       * <​del>​Phase Cal xdB - Sband 1dB</​del>​       * <​del>​Phase Cal xdB - Sband 1dB</​del>​
       * UPS       * UPS
       * Maser battery PLL fault       * Maser battery PLL fault
 +      * run a sych and 100MHz rg58 coax
       * Camera       * Camera
         * <​del>​Lightning arrestor</​del>​         * <​del>​Lightning arrestor</​del>​