User Tools

Site Tools


operation:technical

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
operation:technical [2017/12/05 00:17]
Warren Hankey
operation:technical [2018/01/12 05:48]
Warren Hankey
Line 23: Line 23:
 http://​webcamyg.phys.utas.edu.au http://​webcamyg.phys.utas.edu.au
  
 +===Cryo===
  
 +Warmed and pressure drop
 +
 +- commence vaccuming S/X using turbo pump
 +
 +- turn off the SX cryodyne in the diesel room so that the blue motor stops
 +
 +- turn off the L-band cryodyne by pulling out the lead to the L-band
 +cold head in the focus cabin
 +
 +- use hastings vac gauge and Edwards oil filled vac pump to pump L-band
 +dewar while it warms(dear valve open whilst pumping).
 +
 +- top up the helium supply to 300 psi if the compressor is running OK.
 +If has shut down, increase the pressure slightly then restart the
 +compressor and increase the pressure to 300 psi supply.
 +
 +- locate the leak
 +
 +- power down the compressor
 +
 +- replace leaking hose
 +
 +- power up the compressor
 +
 +-top helium up to 300 psi
 +
 +- commence s/x cooling by turning on cryo S/X power in diesel room
 +
 +- start L-band cryodyne
 +
 +- 3 hours of cooling with vac pump on L-band is required
 +
 +- close l-band dewar valve
 +
 +- remove Edwards pump.
 +
 +-close SX dewar valve and turn off turbo