operations:agenda2013_11_12 [2013/11/11 22:03] Jim Lovell |
operations:agenda2013_11_12 [2013/11/11 22:42] Jim Lovell |
||
---|---|---|---|
Line 21: | Line 21: | ||
- Previous Action Items | - Previous Action Items | ||
- | - Yg clock jumps. No recent problems have been observed. The delay difference is now higher at ~0.4 us but looks stable. | ||
- Light in Ke control room (Brett, Martin). Still to do. | - Light in Ke control room (Brett, Martin). Still to do. | ||
- | - Fringe check script. This seems to be working again but please tell Jamie if you have problems with it. | + | - Katherine RFI (Monitor full band (Martin, Jim)). WiFi turned off. Better? Is there a good data monitoring/collection method? (Jamie) |
- | - Katherine RFI (Monitor full band (Martin, Jim)). This seems to be intermittent, but we are monitoring it. Is there a good data monitoring/collection method? | + | |
- Processing logs, multiple disks [[operations:agenda2013_10_08_eg1|Example]] | - Processing logs, multiple disks [[operations:agenda2013_10_08_eg1|Example]] | ||
- Hand editing required. Chris has volunteered to look at fixing the script(s) | - Hand editing required. Chris has volunteered to look at fixing the script(s) | ||
- | - Which modules to use (Imogen, Jamie). | + | - Which modules to use (Imogen, Jamie). See [[operations:start|Operations page]] |
- | - Recent software, hardware changes. | + | |
- | - Jim to talk to Gino about diagnosing the problem at Ke. | + | |
- | - Jamie: A 26m Mark5A upgrade will allow Mk5B modules to be read. 5C going to Ceduna. | + | |
- | - Plans are afoot to allow the 26m and 12m to run off same clock, swap between them. | + | |
- | - A 26m maser service is due soon. | + | |
- 26m IVS documentation will need updating before May 2014 | - 26m IVS documentation will need updating before May 2014 | ||
+ | - Recent software, hardware changes. | ||
+ | - Jim to talk to Gino about diagnosing the problem at Katherine. Ongoing | ||
+ | - Mark5 to Yarragadee for conditioning | ||
- Operational issues | - Operational issues | ||
- | - Yarragadee support in November | + | - Jamie in Ceduna from this week until end of LBA run. On call: phone Ceduna control room x(+61-8) 8625 3070 |
- Q & A | - Q & A | ||
- Question for Brett: how to find out the network status at the three sites (e.g. 3G or wired). | - Question for Brett: how to find out the network status at the three sites (e.g. 3G or wired). | ||
- Next meeting : Tue 12 Nov at 2 PM | - Next meeting : Tue 12 Nov at 2 PM | ||
- |