User Tools

Site Tools


operations:agenda2013_11_12

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
operations:agenda2013_11_12 [2013/11/11 22:03]
Jim Lovell
operations:agenda2013_11_12 [2013/11/11 22:42]
Jim Lovell
Line 21: Line 21:
  
   - Previous Action Items   - Previous Action Items
-    - Yg clock jumps. No recent problems have been observed. The delay difference is now higher at ~0.4 us but looks stable. 
     - Light in Ke control room (Brett, Martin). Still to do.     - Light in Ke control room (Brett, Martin). Still to do.
-    ​- Fringe check script. This seems to be working again but please tell Jamie if you have problems with it. +    - Katherine RFI (Monitor full band (Martin, Jim)). ​WiFi turned offBetter? ​Is there a good data monitoring/​collection method? ​(Jamie)
-    ​- Katherine RFI (Monitor full band (Martin, Jim)). ​This seems to be intermittent,​ but we are monitoring it. Is there a good data monitoring/​collection method?+
     - Processing logs, multiple disks [[operations:​agenda2013_10_08_eg1|Example]]     - Processing logs, multiple disks [[operations:​agenda2013_10_08_eg1|Example]]
       - Hand editing required. Chris has volunteered to look at fixing the script(s)       - Hand editing required. Chris has volunteered to look at fixing the script(s)
-    - Which modules to use (Imogen, Jamie). ​ +    - Which modules to use (Imogen, Jamie). ​See [[operations:start|Operations page]]
-  - Recent software, hardware changes. +
-    - Jim to talk to Gino about diagnosing the problem at Ke. +
-    - JamieA 26m Mark5A upgrade will allow Mk5B modules to be read. 5C going to Ceduna.  +
-    - Plans are afoot to allow the 26m and 12m to run off same clock, swap between them. +
-    - A 26m maser service is due soon.+
     - 26m IVS documentation will need updating before May 2014     - 26m IVS documentation will need updating before May 2014
 +  - Recent software, hardware changes.
 +    - Jim to talk to Gino about diagnosing the problem at Katherine. Ongoing
 +    - Mark5 to Yarragadee for conditioning ​
   - Operational issues   - Operational issues
-    - Yarragadee support ​in November+    - Jamie in Ceduna from this week until end of LBA run. On call: phone Ceduna control room x(+61-8) 8625 3070
   - Q & A   - Q & A
     - Question for Brett: how to find out the network status at the three sites (e.g. 3G or wired).     - Question for Brett: how to find out the network status at the three sites (e.g. 3G or wired).
   - Next meeting : Tue 12 Nov at 2 PM   - Next meeting : Tue 12 Nov at 2 PM
- 
/home/www/auscope/opswiki/data/pages/operations/agenda2013_11_12.txt · Last modified: 2013/11/12 00:31 by Jim Lovell