This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
operations:agenda2016_05_06 [2016/05/04 07:19] Jesse Swan |
operations:agenda2016_05_06 [2016/05/05 01:55] Lucia McCallum |
||
---|---|---|---|
Line 1: | Line 1: | ||
Meeting notes from 6th May 2016 | Meeting notes from 6th May 2016 | ||
+ | |||
+ | Notes: Only hb 12m in operation over last two weeks | ||
+ | |||
+ | Chair/Presenting: Jesse/Ross | ||
+ | |||
+ | Attendees: Jesse, Ross | ||
+ | |||
+ | Bryn is unable to attend. | ||
**Issues?** | **Issues?** | ||
* hb is behaving well except for the usual tsys errors associated with RFI and weather. | * hb is behaving well except for the usual tsys errors associated with RFI and weather. | ||
- | * When noting high tsys in ERC please specify channels and approximate values. e.g., rather than "tsys high in both bands" you could say "High tsys (~170--250K) for chan 07,09,12,14" | + | * When noting high tsys in ERC please specify channels and approximate values. e.g., rather than "//tsys high in both bands//" you could say "//High tsys (~170--250K) for chan 07,09,12,14//" |
* R1737 -- Slow start to recording of each scan? (~50gb data loss) | * R1737 -- Slow start to recording of each scan? (~50gb data loss) | ||
+ | * RD1604 may19: chang'E observations | ||
+ | * possible shift friday morning |