User Tools

Site Tools


operations:agenda2016_10_13

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
operations:agenda2016_10_13 [2016/10/12 23:08]
Ellen Manning
operations:agenda2016_10_13 [2016/10/12 23:12]
Ellen Manning
Line 30: Line 30:
      * R4760 - 08:00UT Is S-band right polarisation attenuation now supposed to be set at 6 dB, has been noted as either 0 or 6 in the setup instructions but not with much confidence, used to be 7 I think (Ross).      * R4760 - 08:00UT Is S-band right polarisation attenuation now supposed to be set at 6 dB, has been noted as either 0 or 6 in the setup instructions but not with much confidence, used to be 7 I think (Ross).
      * Dynamic scheduling seems to have quite regular slewing during scan errors      * Dynamic scheduling seems to have quite regular slewing during scan errors
 +
 +Bryn is chairing and presenting next fortnight (27th).
 +
 +
/home/www/auscope/opswiki/data/pages/operations/agenda2016_10_13.txt · Last modified: 2016/10/13 02:43 by Ellen Manning