User Tools

Site Tools


operations:agenda2017_03_30

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
operations:agenda2017_03_30 [2017/03/30 01:46]
Bryn Emptage
operations:agenda2017_03_30 [2017/03/30 01:50]
Bryn Emptage
Line 13: Line 13:
  
 Handover Issues: Handover Issues:
-  ​ 
   * RD1704 VC rack timing out - had to travel out to Mt. P to reset the VC rack and the TTY Distributor.   * RD1704 VC rack timing out - had to travel out to Mt. P to reset the VC rack and the TTY Distributor.
 +    * Due to power failure
 +  * equip.ctl file check?
 +  * Wind sensor at hb locked up - continuous wind stow. Do we have a fix for this in the wiki?
 +  * Network issues at Ke - R1784
 +  *  ​
 +
/home/www/auscope/opswiki/data/pages/operations/agenda2017_03_30.txt · Last modified: 2017/03/30 02:35 by Bryn Emptage