This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Last revision Both sides next revision | ||
operations:agenda2017_11_23 [2017/11/23 02:30] Arwin Kahlon |
operations:agenda2017_11_23 [2017/11/23 02:47] Arwin Kahlon |
||
---|---|---|---|
Line 12: | Line 12: | ||
* Cont17 | * Cont17 | ||
- | * 15 day cont, 3 diff groups of scheds, all schedules will be pre dudged. Email to follow with the deets. End message and start messages need to be sent after every exp. 5 mins gap between experiments. | + | - 15 day cont, 3 diff groups of scheds, all schedules will be pre dudged. Email to follow with the deets. End message and start messages need to be sent after every exp. 5 mins gap between experiments. |
* Please check your emails prior to every shift start, even if the experiment is a vanilla r1 or r4. | * Please check your emails prior to every shift start, even if the experiment is a vanilla r1 or r4. | ||
* SAR tracks included in regular experiments. | * SAR tracks included in regular experiments. | ||
- | * once every 10 days, schedules will be modified to include the satellites. Be present during these times and monitor the instruments for any errors, include missed scans in the handover notes. | + | - once every 10 days, schedules will be modified to include the satellites. Be present during these times and monitor the instruments for any errors, include missed scans in the handover notes. |
+ | * Ke will probably have power issues as the storm season has started. Some UPSs have been fixed, hopefully we are somewhat resistant to the power surges. | ||
+ | * January roster will be done before Christmas. | ||
** | ** |