This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
operations:agenda2017_11_23 [2017/11/23 02:34] Arwin Kahlon |
operations:agenda2017_11_23 [2017/11/23 02:37] Arwin Kahlon |
||
---|---|---|---|
Line 17: | Line 17: | ||
* once every 10 days, schedules will be modified to include the satellites. Be present during these times and monitor the instruments for any errors, include missed scans in the handover notes. | * once every 10 days, schedules will be modified to include the satellites. Be present during these times and monitor the instruments for any errors, include missed scans in the handover notes. | ||
* Ke will probably have power issues as the storm season has started. Some UPSs have been fixed, hopefully we are somewhat resistant to the power surges. | * Ke will probably have power issues as the storm season has started. Some UPSs have been fixed, hopefully we are somewhat resistant to the power surges. | ||
+ | * January roster will be done before Christmas. | ||
** | ** |