This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
operations:documentation.ivs.drudg_ureop [2012/08/27 22:47] Jim Lovell |
operations:documentation.ivs.drudg_ureop [2012/11/27 23:04] Jamie McCallum |
||
---|---|---|---|
Line 1: | Line 1: | ||
+ | The ultra-rapid EOP measurements use either modified IVS schedules (with Hobart in "tag-along" mode) or bespoke schedules. In either case, the usual slogit procedures can be used but you should make sure that the correct skd file in in place on pcfshb before starting & make sure it doesn't get overwritten. | ||
+ | |||
Prepare the schedue and procedure files as usual but make sure the preob and postob procedures look like this: | Prepare the schedue and procedure files as usual but make sure the preob and postob procedures look like this: | ||