This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
operations:documentation.ivs.finishing_v2 [2014/10/22 02:49] Jamie McCallum |
operations:documentation.ivs.finishing_v2 [2016/05/26 01:47] Jim Lovell |
||
---|---|---|---|
Line 8: | Line 8: | ||
* [[operations:documentation.ivs.commentsfile|Logs and end-of-experiment message instructions]] | * [[operations:documentation.ivs.commentsfile|Logs and end-of-experiment message instructions]] | ||
- | Unless there is another experiment to follow shortly, exit from the Field System by typing the following command in the eRemoteControl operator input window: | + | Unless there is another experiment to follow shortly, exit from the Field System by typing the following command in the eRemoteControl operator input window **NOTE: Do not do this for ''hobart'' the 26m PCFS!**: |
<code>terminate</code> | <code>terminate</code> | ||
Exit the log monitor program. | Exit the log monitor program. | ||
- | If Yarragadee is observing (and is not following on), email the operator to let him know the observation is finished and the telescope has gone to stow at auscope-yg@postoffice.utas.edu.au | + | If Yarragadee is observing (and is not following on), email the operator to let him know the observation is finished and the telescope has gone to stow at auscope-yg@list.utas.edu.au |
- | + | ||
- | If this is the last experiment of the week and there is a gap of a day or more until the next experiment, please reboot the PCFS computer and the DBBC. To do this for the PCFS: | + | |
- | * open a terminal on pcfs[ho|ke|yg] as ''oper'' | + | |
- | * type ''su'' | + | |
- | * (type in the root password) | + | |
- | * type ''reboot'' | + | |
- | + | ||
- | It will take a couple of minutes to reboot. You'll need to manually start the VNC server next: | + | |
- | * open a terminal on pcfs[ho|ke|yg] as ''oper'' | + | |
- | * type ''vncserver'' | + | |
- | * log out with an ''exit'' | + | |
- | + | ||
- | For the DBBC, first shut down the PC set using the "Start Menu" and then power cycle the entire unit using the Internet Power switch. To do this: | + | |
- | * open a terminal on ops2 | + | |
- | * type ''telnet ipshb'' | + | |
- | * (type in the root password) | + | |
- | * type ''/Boot 5'' (replace 5 with the number correponding to the DBBC) | + | |
- | * type ''/X'' to exit. | + | |
- | + | ||
+ | <note important>Note: it is no longer necessary to reboot PCFS computers at the end of experiments</note> | ||
Please power-down the stairwell monitors using the switches under the main desk labelled Screen 1, Screen 2, ... when finishing an experiment or after hours to save power. | Please power-down the stairwell monitors using the switches under the main desk labelled Screen 1, Screen 2, ... when finishing an experiment or after hours to save power. | ||
If another experiment follows this one, go to the next step: [[operations:documentation.ivs.newstart_v3_fs9.10.5|Following on with another experiment]] | If another experiment follows this one, go to the next step: [[operations:documentation.ivs.newstart_v3_fs9.10.5|Following on with another experiment]] |