This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
operations:documentation.ivs.mark5_module_selection [2017/04/20 03:40] Warren Hankey |
operations:documentation.ivs.mark5_module_selection [2017/04/20 03:41] Warren Hankey |
||
---|---|---|---|
Line 5: | Line 5: | ||
As a rule R1 and R4 on a module by themselves (only at Hobart may R1 R4 go on a module together) and not mixed with other experiment types. If possible, please try to record an entire experiment onto a single module, most especially R4, CRDS, CRF, and R1 experiments. If it won't fit, please contact observatory staff - they will usually be able to put a module with enough space into the Mark 5. | As a rule R1 and R4 on a module by themselves (only at Hobart may R1 R4 go on a module together) and not mixed with other experiment types. If possible, please try to record an entire experiment onto a single module, most especially R4, CRDS, CRF, and R1 experiments. If it won't fit, please contact observatory staff - they will usually be able to put a module with enough space into the Mark 5. | ||
- | If not instructed by the spreadsheet, check to see how much data will be recorded; then see which modules are mounted in the Mark5; choose one that is big enough as follows. | + | If not indicated on the spreadsheet, you need to fit the experiment on available modules. Check to see how much data will be recorded; then see which modules are mounted in the Mark5. |
===== Data requirement ===== | ===== Data requirement ===== |