This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
operations:documentation_ops2_pcfs9.10.5plus [2020/03/26 01:46] Jamie McCallum |
operations:documentation_ops2_pcfs9.10.5plus [2020/03/26 01:48] Jamie McCallum |
||
---|---|---|---|
Line 16: | Line 16: | ||
===== IVS Observation Instructions ===== | ===== IVS Observation Instructions ===== | ||
- | <note important>Off-site experiment monitoring notes [[operations:documentation_ops2_pcfs9.10.5plus:offsite|]]</note> | + | **Off-site experiment monitoring notes [[operations:documentation_ops2_pcfs9.10.5plus:|Off-site experiment monitoring notes]]** |
Below are the links to a step-by-step procedure for making IVS observations on the 12m and 26mtelescopes. The current version of e-RemoteCtrl has a built-in checklist which can now be used during the setup procedure. So the first task is to start the Observing and monitoring software at each site, then e-RemoteCtrl. | Below are the links to a step-by-step procedure for making IVS observations on the 12m and 26mtelescopes. The current version of e-RemoteCtrl has a built-in checklist which can now be used during the setup procedure. So the first task is to start the Observing and monitoring software at each site, then e-RemoteCtrl. |