This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
handover:aug020 [2016/01/11 21:41] Jesse Swan |
handover:aug020 [2016/01/12 01:51] (current) Jesse Swan |
||
|---|---|---|---|
| Line 6: | Line 6: | ||
| * UT0630 Experiment started OK (JS) | * UT0630 Experiment started OK (JS) | ||
| - | * 21:40 UT - Tsys values all too high except for bands 11, 12. Continuing to monitor. (Ellen) | ||
| Line 16: | Line 15: | ||
| * UT0638, schedule resumed, UT0652 after problems with checkmk5 procedure but clock drifts continue. | * UT0638, schedule resumed, UT0652 after problems with checkmk5 procedure but clock drifts continue. | ||
| * 11:44 UT - Schedule stopped as delay differences kept drifting, with DBBC reset achieving nothing. (Ellen) | * 11:44 UT - Schedule stopped as delay differences kept drifting, with DBBC reset achieving nothing. (Ellen) | ||
| + | * UT2310 Halted for DBBC reset, delay differences still drifting (Bryn) | ||
| + | * UT0004 Experiment Halted, delay differences drifting faster. | ||
| **Yarragadee** | **Yarragadee** | ||