handover:aust53 [2014/10/16 05:34] liza |
handover:aust53 [2014/10/16 07:02] (current) liza |
||
|---|---|---|---|
| Line 15: | Line 15: | ||
| * The LO unlocked several times for short periods from 23:00 till 01:30 UT (Liza) | * The LO unlocked several times for short periods from 23:00 till 01:30 UT (Liza) | ||
| * rxp#Receiver focus X : -256.4mm ; Y : 250.8mm ; Z : 18.6mm; -- Y should be 248mm (Liza) | * rxp#Receiver focus X : -256.4mm ; Y : 250.8mm ; Z : 18.6mm; -- Y should be 248mm (Liza) | ||
| - | * 2014.289.05:24 LO reported to be unlocked, no alarm (Liza) | ||
| * 04:38 UT: wiring error of pps at Hobart was corrected. Don't know what the impact was before (Liza) | * 04:38 UT: wiring error of pps at Hobart was corrected. Don't know what the impact was before (Liza) | ||
| + | * * 2014.289.05:24-05:36 LO reported to be unlocked, no alarm on occurence (Liza) | ||
| Hobart (12m) | Hobart (12m) | ||
| - | * 04:38 UT: wiring error of pps at Hobart was corrected. Don't know what the impact was before | ||
| * Recording to 6 TB module HAY-0055 in bank B, +0 GB (Chris) | * Recording to 6 TB module HAY-0055 in bank B, +0 GB (Chris) | ||
| + | * Anemometer is not connecting (Liza) | ||
| + | * RFI: common problem in ch 14, 15 (0-15) (Liza) | ||
| + | * 04:38 UT: wiring error of pps at Hobart was corrected. Don't know what the impact was before | ||
| + | * 05:58UT: RFI: new indication in channel 11 (0-15), periodically occuring spike and phase errors. Was noticed also once before (RD1409 or aust50) (Liza) | ||
| Katherine | Katherine | ||