This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
handover:ohg118 [2019/04/03 15:16] Warren Hankey |
handover:ohg118 [2019/04/04 02:29] (current) Patrick Yates |
||
---|---|---|---|
Line 1: | Line 1: | ||
====== OHG118 ====== | ====== OHG118 ====== | ||
- | |||
- | |||
- | |||
- | |||
**Katherine 12m** | **Katherine 12m** | ||
Line 10: | Line 6: | ||
* 1730UT Experiment started OK (Prad). | * 1730UT Experiment started OK (Prad). | ||
+ | * 01:15UT Module change. | ||
+ | * Disk VSN: HOB+1010/16000/1024 | Data volume at beginning: 0 GB | ||
**Yarragadee 12m** | **Yarragadee 12m** | ||
Line 30: | Line 28: | ||
* 0650UT Clkoff command gives different values that's way apart, when used in pcfcho and pcfshb. Jamie said that he'll look into it (Jay). | * 0650UT Clkoff command gives different values that's way apart, when used in pcfcho and pcfshb. Jamie said that he'll look into it (Jay). | ||
* 13:21UT - HOB+1006 is full, switched to HART+101 (Patrick) | * 13:21UT - HOB+1006 is full, switched to HART+101 (Patrick) | ||
- | * 14:07UT - HART+101 is full. On my way to Mt Pleasant to put a new module in. (Patrick) | + | * 14:02UT - HART+101 is full. On my way to Mt Pleasant to put a new module in. (Patrick) |
- | * 15:05UT - Swapped out HART+101 for HOB+1007 (bank B). Schedule resumed. (Patrick) | + | * 15:05UT - Swapped out HART+101 for HOB+1007 (bank B). Schedule resumed. Missed scans 093-1403 through 093-1507 (Patrick) |
- | <note>Disk VSN: HOB+1007/16000/1024 | Data volume at beginning: 0 GB</note> | + | * Disk VSN: HOB+1007/16000/1024 | Data volume at beginning: 0 GB |
+ | * 15:10UT - SX receiver pressure + temperature started to rise, turned on pump for half an hour to lower these values. (Patrick) | ||
+ | * 16:40UT - ops8 system reboot took down mk5hb Dimino. Must have been running on ops8. Started Dimino through terminal on newsmerd vnc. (Patrick) | ||