This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
handover:r1708 [2015/10/05 17:03] David Horsley |
handover:r1708 [2015/10/06 14:10] (current) David Horsley |
||
|---|---|---|---|
| Line 2: | Line 2: | ||
| **Hobart 26m** | **Hobart 26m** | ||
| - | Module: HOB+0096, start pos 317GB | + | Module: HOB+0096, start pos 3170GB |
| - | + | ||
| - | * 17:02 UT - Late start (2min) (JS) | + | |
| + | * 1702UT - Late start (2min) (JS) | ||
| + | * 1709UT - ch09, and ch03 very low voltage. Others are fine in channel range, so leaving if values for now (JS) | ||
| + | * 2114UT - Receiver stuck in Lband Scans failed 278-1700 through 278-2217 (JS) | ||
| + | * 2157UT - OTTER interface reset (using 'r' command) and SX reciever put on axis (JS) [Have updated the setup notes to include this as a fix for stuck reciever] | ||
| + | * 2205UT - ch09, and ch03 still bad readings (JS) | ||
| + | * 2210UT - Field system restarted (wasn't behaving with schedule resume) (JS) | ||
| + | * 2220UT - Scan 278-2217 successful (JS) | ||
| + | * 2335UT - Hobart26 drives have been switched off since ~2300UT, despite various claims (e-RemoteCtrl, antenna monitor etc.) that the antenna is slewing to source (SS) | ||
| + | * Antenna stowed due to high wind at ~00:20UT | ||
| + | * 08:00 UT Mark VI formatter time inconsistent with DAC time (lagging by 1 second), has been corrected for future scans/experiments (Ross) | ||
| + | * 08:00 UT Mark VI IF channels 03 and 09 showing error lights, problem has been resolved for future scans/experiments (Ross) | ||
| + | * 13:38 UT - Schedule resumed after wind died down. First scan 279-1346 at disc pos 418.4 GB. (Ellen) | ||
| + | * 14:07 UT - Ridiculously high tsys measurements continuously. Imogen said not to bother fixing. (Ellen) | ||
| **Katherine** | **Katherine** | ||
| Line 11: | Line 22: | ||
| Module: UAO-0031, start pos 0GB | Module: UAO-0031, start pos 0GB | ||
| - | * 17:00 UT - Experiment started okay (JS) | + | * 1700UT - Experiment started okay (JS) |
| + | * 13:54 UT - Module ran out of space after recording 1983.649 GB, swapped over to HAY-0041, first scan 279-1354b. (Ellen) | ||
| **Yarragadee** | **Yarragadee** | ||
| Line 17: | Line 29: | ||
| Module: HOB+1007, start pos 11401 GB | Module: HOB+1007, start pos 11401 GB | ||
| - | * 17:00 UT - Experiment started okay (JS) | + | * 1700UT - Experiment started okay (JS) |
| + | * 13:26 UT - Disc pos is over 100 GB behind the schedule. I can't find any explanation for this. (Ellen) | ||
| {{tag>}} | {{tag>}} | ||