This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
operations:documentation_ops2_pcfs9.10.5plus [2019/08/20 13:07] Pradyumna Kiran Kummamuru |
operations:documentation_ops2_pcfs9.10.5plus [2020/09/21 05:49] (current) Jamie McCallum [Monitoring Observations on the 26-m] |
||
|---|---|---|---|
| Line 1: | Line 1: | ||
| ====== Operator Documentation for observations ====== | ====== Operator Documentation for observations ====== | ||
| - | |||
| ====== Background ====== | ====== Background ====== | ||
| * Background reading for new operators | * Background reading for new operators | ||
| Line 16: | Line 15: | ||
| * [[operations:maps|Maps]] | * [[operations:maps|Maps]] | ||
| ===== IVS Observation Instructions ===== | ===== IVS Observation Instructions ===== | ||
| + | |||
| + | **[[operations:documentation_ops2_pcfs9.10.5plus:offsite|Off-site experiment monitoring notes]]** | ||
| Below are the links to a step-by-step procedure for making IVS observations on the 12m and 26mtelescopes. The current version of e-RemoteCtrl has a built-in checklist which can now be used during the setup procedure. So the first task is to start the Observing and monitoring software at each site, then e-RemoteCtrl. | Below are the links to a step-by-step procedure for making IVS observations on the 12m and 26mtelescopes. The current version of e-RemoteCtrl has a built-in checklist which can now be used during the setup procedure. So the first task is to start the Observing and monitoring software at each site, then e-RemoteCtrl. | ||
| Line 27: | Line 28: | ||
| * [[operations:documentation.eremotecontrol_checklist_midob26]|26-m checklist parameter description]] | * [[operations:documentation.eremotecontrol_checklist_midob26]|26-m checklist parameter description]] | ||
| - | * [[[operations:AUM-hb|New procedures for the AUM experiments and the Hobart12 (Hb) telescope]] | + | * [[[operations:AUM-hb|New procedures for the Mixed-Mode (AUM) experiments with Hobart12 (Hb) and Katherine (Ke) telescopes]] |
| ==== Monitoring Observations on Parkes 64-m ==== | ==== Monitoring Observations on Parkes 64-m ==== | ||
| Line 310: | Line 311: | ||
| ==== Monitoring Observations on the 26-m ==== | ==== Monitoring Observations on the 26-m ==== | ||
| - | * Please note that e-RemoteControl does not adequately show the recorded/free space on a module in mkv. To see how full is the module, please use commands //mk5=bank_set// (module capacity) and //disk_pos// (write pointer position). | + | * Please note that e-RemoteControl is now longer supported and will not connect to the field system! |
| + | * Instead, please use ''stream_log ho'' to create a local file for the log monitor. | ||
| + | * Checklists now have to be manually triggered with ''checklistHo $exper'' (where ''$exper'' is the experiment name) - to launch the start or end checklists, please use ''checklistHo $exper start'' or ''checklistHo $exper stop'' repectively. | ||
| * Parameters of the check-list during observation for 26-m are [[operations:documentation.eremotecontrol_checklist_midob26|explained here]]. | * Parameters of the check-list during observation for 26-m are [[operations:documentation.eremotecontrol_checklist_midob26|explained here]]. | ||