====== RF service ====== Yesterday Jim and I removed the mylar window over the feed. We inspected for moisture and found none. We also performed the following operations: * Sealed the S-band loop couplers with Araldite * tightened a few loose SMA connectors in the downconverter box. * checked the Elevation encoder mounting bracket bolts were tight that fasten it to the turning head. {{tag>}}