====== crds88 ====== **Hobart 26m** Disk VSN: HOB+0094 Volume at Beginning: 7025.286 GB * 1800UT Experiment started OK (Bryn) * 1800UT Got a Large Difference between formatter and maser delay (11.023 us), but fmset clock values all fine - VC rack is happy. (Bryn) **Hobart 12m** Disk VSN: HOB+1007 Volume at Beginning: 11275.03 GB * 1800UT Experiment started OK (Bryn) * 0000UT getting the "s5 -112 rfpcn: EOF pre-draining input, rfpic probably crashed, connection closed" errors persistently, these are due to the hardware failure of the PIC unit in the telescope pedestal, unlikely to be resolved without hardware replacement, as noted in the previous experiment. (Arwin) * 0000UT if the beeps get annoying, the above error can be (i think) silenced by "tnx=s5,-112" in the fs or erc. However, you'll need to terminate the fs at the end of the experiment, probably not until this is fixed anyway. (Arwin) **Katherine** Disk VSN: HOB+0119 Volume at Beginning: 1042.69 GB * 1800UT Experiment started OK (Bryn) {{tag>}} ~~DISCUSSION~~