====== R4690 ====== **Hobart** Module: BKG+0136, 1.0 GB **Katherine** Module: NAIC-004, 1.0 GB * Maser AHM power ~/= on 23.8 (blue number). ** Should call Brett during the day** (Lucia) * 02:31:06 UT PPS Delay through DBBC changed. This may cause a small break in the clock offset (Imogen) **Yarragadee** Module: USN-0087, 1.0 GB * ifc is on 63 attenuation but the power levels look good (Lucia) * 02:55:16UT ifc has righted itself to about 20 attenuation (Imogen) {{tag>}} ~~DISCUSSION~~