====== R4709 ====== **Hobart 26m** Module: HOB+0096, start pos 10316.985 GB * 18:16 UT - Receiver pressure at 4.2, 70K stage at 105.9, 20K stage is 67.1. I called Brett and he thinks we should leave it until he can go out at 9am in 3.5 hours. (Ellen) * 18:30 UT - Experiment started ok. (Ellen) * 02:38UT schedule halted due to wind stows (Imogen) * 03:32 UT schedule resumed after wind died down. Missed scans 289-0239a-289-0343 (Imogen) * 12:31 UT He pressure too low and 70K temperature too high (Ross). **Katherine** Module: MED-0020, start pos 0 GB * 18:30 UT - Experiment started ok, except the command "clkoff-2" was still in the proc file, so it recorded a huge delay difference. Halted the schedule after the first scan. I couldn't find the right file, called Imogen to fix. (Ellen) * 18:50 UT - Imogen was unable to fix due "clkoff-2" to internet problems. I have changed the settings in the log monitor so it won't ring alarms every scan. Field system crashed when I tried to restart the schedule. Had to reboot pcfske. The mk5 then crashed and needed power cycling. Did test recording and the Autocorrelation looks fine. (Ellen) * 19:52 UT - Schedule resumed. Scans missed 288-1836 to 288-1949, inclusive (~ 90GB). (Ellen) **Yarragadee** Module: USN+0224, start pos 5505.2 GB * 18:30 UT - Experiment started ok. (Ellen) * 22:03 UT - All tsys values in S-band way too high. (Ellen) {{tag>}} ~~DISCUSSION~~