====== RD1705 ====== **Hobart 26m** Module: HOB+1007/16000, start pos 7401.6 GB * 1730 UT - Experiment started on-time. Formatter/maser delay offset larger than normal (~2.8 us), it seems stable (+-0.05 us) with clkoff values stable. As the proc file does not call maserdelay I was unsure if this is normal. Called Warren and he is out at the telescope having a look if things are working correctly. At this stage it is being left as is. (Tiege) * 2122 UT - Schedule halted to put correct receiver on axis. Prior to this, the 22 GHz receiver was installed and no valid data would have been recorded. (JMc) * 2136 UT - First useful data - previous scan not reached in time after Rx change, (JMc) * 0606 UT - Pressure and temperatures too high - alarms going off. (25 microns Hg, 20K stage at 42K, and 70K stage at 85K) called Mt. Pleasant and Jim is restarting the vacuum pump. (Bryn) * 0643 UT - Temperatures still high in 20K and 70K stages (41K and 78.8K), but are slowly falling. (Bryn) * 0747 UT - 70K stage back at 65K. 20K stage at 35K (Bryn) {{tag>}} ~~DISCUSSION~~