====== Katherine To Do ====== * Phase cal testing (temperature stabilisation? Bad filters?) * DBBC service - check cables, internal connections, bad boards) * Apparently working as of 25/7/14 after replacing Fila OUT, reseating stack & PCI7200 card & cables. * earthing of DBBC and MK5 units using proper earth connections * DBBC cont cal - tune for ~2-5% CONT CAL, 5-10% pulsed CAL * CONT CAL seems to be triggered when PULSED CAL is? Check wiring on spare board? * Y-factor tests - get all CAL factors via DBBC. * control room temp sensors - MoniCA * twister cable suspender * fix UPS * pedestal and maser room fan, fix/replace * webcam clean * Upgrade mk5-2ke. Replace module back plane * Back up all PCs * Maser service. * tidy ptz wiring * clean all sky cam lens * check for rodents in genset * generator battery charger reduce electrolyte boiling * feed temp/press sensor * weed control * insect proofing of the hub * pedestal base flange seal, recoat with paving paint * grooves in concrete foundation to promote drainage * remove rust from container and paint * Feed tube * test * Hub * Look at antenna step-response with CTScope * Replace fan on RF box * Pedestal * Evict wildlife * drain spare conduit * Modify controller setting to accept remote resets, and test * Antenna structure * Put close-outs around elevation jack once cabling, installation and testing is complete * Generator * Connect remote monitoring of diesel running and 'not in auto' * Site * Remove rubbish * weeding and mowing * shelter above container * hardware * Confirm full set of spares, record serial numbers * Control room equipment * Set up suitable backup mechanism for timing PC (in case of disk failure) * RF/IF testing * Install power meter plotting software on pcfs (Jim) * Check all four signals are getting through and bandpasses look reasonable * any signs of RFI? * Are cable compensators doing a reasonable job? * look for phase-cal tones at S and X. About the right level? * look for noise diode, check its strength * check that a tone can be put through the system * measure Y-factors at all four bands, calculate Tsys * Attempt to detect a bright source * Jim to provide list of precessed source coordinates * Determine gross pointing offsets and obtain a zeroth-order model (Jim) * Measure SEFD at all bands. Should be ~2500 Jy * Fringe check to Hobart * Software * Confirm PCFS can talk to: * Antenna controller * Check source=stow command * GPIB devices (two counters and SML) * Weather station * Anemometer * Power meter * check Tsys measurement works * Mark5 * Test Mark5 * Both banks OK? Martin had a concern * MONICA * Logging information from: * RF equipment * IF box * Weather station * Anemometer * Antenna Controller * The counters * SML * Maser status * Site power status (mains or UPS/generator) * Documentation of how to access MONICA data * Check printing from PCFS works * Display screen setup and test. * Warning/alarm system when parameters exceed allowable range. * Documentation for local users: * Disk handling logistics (dispatch and collection) * Disk conditioning * Disk labeling * How to use HMI * How to use the PCFS * How to control the antenna from the hand-box * How to get the antenna out of its limits * How to recover the FS PC in case of disk failure * How to recover the timing PC in case of disk failure * Routine antenna checks: * Check for blocked drainage (those wasps fill them with mud) * Check for water getting into feed tube, hub, pedestal, drives * Check for wildlife getting in to antenna structure * Check for overheating of RF equipment (via MONICA) * Listening to the drives * MASER list * check PLL battery fault cause * * breid List * Dehydrator * Dehumidifier * Eye-bolt in the cone * Wash Subreflector * Doors in Hub, trim and cutouts, fit * Rod and hook for retrieving fall arrester * eye bolt for fall arrester * Phase Cal xdB - Sband 1dB * UPS * Maser battery PLL fault * run a sych and 100MHz rg58 coax * Camera * Lightning arrestor * focus * Lens: clean and check * Install window blinds * Audio - microphone * Wind auto-stow signal * back shell on wind stow connector * EL encoder offset parameters * Send back excess stuff such as nuts and bolts for Yarragadee * Raise fall arrest inertia reel * Cover over dehydrator in pedestal * Find water leak in conduit 2 * Ladder storage in container * Assemble shelf unit for MK5 modules * Label equipment * Label supension files containing equipment manuals * oil change in az gear boxes and check/fix cause of leak * sort generator battery and charging system * oil change generator * painting pedestal rust spots * painting container rust spots * Thermal sensors calibrate * Sort mark5 earthing and other problems * Sort counter 3 * install additional switch * wire in PDUs * LAN cabling * install IR light properly * check lightning arresters * Bunnings * pedestal Fans * Halogen globes 500W * Paraflood Low energy * rags * 9V batteries * Vac cleaner bags. for shop vac * 3 in one oil for fan motors * Car parts NT * diesel oil * diesel filter * fan bearing grease Take * Switch 24port 1Gbps