====== Notes for July 2016 tracks ====== * 7z files a hassle * TLE copied to station.tle * 200aKe[Yg].vex moved to /usr2/sched * edited vex file to change experiment name to 200a rather than 200aKe (or Yg) * Ran drudg. Ran satsnapchecker.pl (after editing it for this experiment) * Still needed to change proc and sip file names to 200ake[yg] * edited proc file to change mk5 mode to 4 Mbps * Added checkmk5 procedure * Tried 1sec updates. Works but can't stop it with a @ command (not enough time?). 2 sec updates are OK though, so going with them. * Added some lines to the start of the snap file to put the antenna at the correct az and el for the start of the track. * 2016 07 18 at Ke * Started in the wrong Azimuth wrap! * 2 sec updates blocked all other FS scheduled commands * Went to 5 sec for end of track and some data were recorded * Look for data between 10:18:30 and 10:20:30 UT