Operators meeting 09.10.2014 Agenda 1. Current issues: * Wind stows (and other ongoing problems) have to be marked in the handover notes with time stamps * Handover notes MUST be copied to the end message, especially if there were problems. * 26-m eRC checklist parameters returned [[http://auscope.phys.utas.edu.au/opswiki/doku.php?id=operations:uscope.phys.utas.edu.au_opswiki_doku.php&id=operations:documentation_ops2_pcfs9.10.5plus#monitoring_observations_on_the_26-m|back to the page]] * Those who edit wiki, please make sure that none of the important links disappear. * TBA 2. AUST marathon outcomes * Gathering feedback from observers, respond by next meeting. * Module assignment and confusion discussion 3. Recently correlated experiments to be rewieved *AUST25 *AUST29 *//AUST34// *//AUST35// (last two to be revisited later after the analysis) 5. Roster, any questions or comments 6. Other items