=======Meeting 12th October======= Chair: Tiege Present: Tiege, Jamie, Lucia, Liz, Ellen, Mas, Patrick, Jesse Apologies: Bryn, Jonny, Ross, Arwin, Lucas Absent: General Issues: - How is everyone going with Hobart 26m shifts currently, are people confused as to what back-ends should be being used or is that information getting conveyed properly? * Hopefully number of backends will be consolidated down to only two. MKV being retired. * Before starting any shift, check emails to make sure no specific information has been sent to you. - Isn't LBA 2017OCT session soon? * No LBA observing due until next year! - Cont17 roster - Nov 28 - Dec 12. * Ellen! Start the rostering! * 3 stations, two different schedules * Check roster as shift times may be changed. * 9am-3pm, 3pm-11pm and 11pm-9am - Emails not getting sent through * Jamie has now fixed this issue, so the IVS ops email lists are correctly updated now. Handover Issues: - Ho: Vacuum pressure leak for receiver cooling system (AUA029) * Fixed! Caused by the weather warming. - Ke: Mick changed disk in middle of recording, was the mystery disk that was originally being recorded to every identified? (R4811) * This was sorted, thanks to Warren. * Make sure to check module allocation sheet. - Yg: Pointing offsets/tracking errors, Note from Arwin in handover notes: "During setup, noticed yg had large offsets in the antenna checks, had to the the pointing checks again and the offsets were better the second time around. This has happened a few times, should this be raised at the meeting?" * The pointing should be OK, Jamie is going to have a squiz.