**Chair:** Simin ** Next week's chair: ** Mas **Attended:** Mas, Katie, Becca, Prad, Jay, Lim, Jamie, Gabor, Guifre **Apologies:** **Absent:** Earl, Eloise, Lucas, Patrick, Tiege **General Issues** * Hobart 26m * Problem with the brakes problem/a hydraulic fault alarm * Hydraulic pipes have to be replaced, need one or two more days * LBA shifts coming on March, June and July **Handover Issues** * R4934 * Yarragadee 12m * Large difference between formatter and maser delays. Check for stability of new offset. error happens occasionally and clears itself (Lim) * Jamie will look at it. * AUA061 * Yarragadee 12m * Very large positive data difference. +200TB or about 5%. Module is large enough to handle additional data (Lucas). * Probably one-hour si0056 experiment causes the data difference. * Hobart 12m * A series of clock-jumps on the dbbcho on the order of -0.015us (Lucas). * In mix-mode observations can be ignored. * Katherine 12m * Drives lost connection, got stuck (Lucas). * Flexbuffke got into a nasty state and wasn't happy (Lucas). * The current fix is to (halt obviously), umount all the drives, remount them, restart jive5ab and re-setupsx (Lucas). * Due to wet season and power outages. Have to restart the connection and Fluxbuff.