**Chair:** Lim **Next meeting chair:** Simin **Attended:** Mas, Katie, Guifre, Jamie, Earl, Prad, Jay **Apologies:** Simin, Eloise, Patrick **General Issues** * Ho26 S/X receiver sensitivity issue solved after LNA Power supply repair. Nominal temperature reading again. Cryo issue now. * Note: Brett on leave, Warren on its own now at Mt Pleasant. **Handover Issues** * r1974 * Ho26: maserhb seems to be down (Simin) * Computer runs the software has failed. (windows 7 image, can clone the drive, somehow.. Cannot monitoring the maser yet at the moment) * crd109 * Ho26: errors“ Delay trough DBBC has changed. Monitor for stability and reset DBBC if it drifts” (Mas) * Lost sync through dbbc, power cycle seems to have solved it. PRC file wasn't calling the monitoring command, seems to be commented out. pps_delay slips while the fmset looks correct, not sure what issue there is.