Yesterday Jim and I removed the mylar window over the feed. We inspected for moisture and found none. We also performed the following operations:
Sealed the S-band loop couplers with Araldite
tightened a few loose SMA connectors in the downconverter box.
checked the Elevation encoder mounting bracket bolts were tight that fasten it to the turning head.