18:00 Experiment started OK (Ross)
GPIB has been removed so no clkoff or maserdelay measurements reported (Ross)
23:36 Ke reporting overflowing Tsys measurements in all channels, and autocorrelation spectra looks super weird. Power cycled DBBC, reconfigured, and synched times to fix it. Resumed schedule at 00:10 with scan No0082 (Patrick)
00:33 Overflowing Tsys measurements again. Restarted and reconfigured DBBC as before. Resumed at 00:47 with scan No0093. (Patrick)
05:10 Tsys overflowing again, restarted and reconfigured DBBC as before. mk5 wouldn't resync, got this error when running fmset: mk5cn: time-out, connection closed. Tried restarting Mark5 (Dimino process), and reconfiguring DBBC again, but no luck. Jamie looking in to it. (Patrick)
06:00 DBBC needs fixing onsite, a card may need replacing. Katherine is out of the experiment, and hopefully will be fixed tomorrow. (Patrick)
07:20 Mick fixed issues with DBBC, good data again at scan no0164. (Bryn)
10:00 network issue, lost connection to mk5ke. getting error: no route to host. power cycling mk5 and reformatting time with fmset. Missed scan no0189 and no0190. (Bryn)