Hobart
Module: HOB+0104, 0.77 GB
Katherine
Module: HOB+0128, 0.77 GB
UT0630 Experiment started but with large clock offsets (JMC)
UT0632 Experiment halted to reconfigure DBBC.
UT0638, schedule resumed, UT0652 after problems with checkmk5 procedure but clock drifts continue.
11:44 UT - Schedule stopped as delay differences kept drifting, with DBBC reset achieving nothing. (Ellen)
UT2310 Halted for DBBC reset, delay differences still drifting (Bryn)
UT0004 Experiment Halted, delay differences drifting faster.
Yarragadee
Module: HAY-0050, 0.64 GB