Important pre-notes
Experiment AUG031 isn't the first one of this name this year. The drudge (via slogit) initially got the OLD version from day 094 instead of 297. So make sure to check the UT day in the sum file. I think Jamie fixed it by manually re-drudging? (please edit this Jamie)
“ ERROR ch -4 Device v3 timed-out on response from MATCN ” means that something is wrong with the mk4 VCs and the mk4 rack (white one with 'VC' lights) needs to be restarted manually at Mt P. This error appeared after setupsx when changing the 26m back to the mk4 from the mk5/dbbc. The rack can be reset by turning off, waiting then turning on again and waiting (red lights everywhere until you setupsx again). The on/off switch is at the top of the rack. If this doesn't fix the matcn error then you needs to call Brett.
Hobart 26m
Disk module HOB+1000, initially recorded 4302.249 GBs.
Hobart 12m
Disk module HART+106, 0.705GBS initially recorded.
Katherine
Disk module HOB+0083, 3.205 GBs initially recorded.
Yarragadee
Disk module HOB+1003, 0.769 initially recorded.