Note to observers: Aircon in Auscope control room appears to be out of water or something. If you turn it on, it smells bad and doesn't really heat up the room.
Hobart 26m
Disk VSN: HOB+0015/6000
Start Pos: 4105 GB
Exp started OK.
He supply press ~275 psi. Informing Brett.
5:15UTC - He was supplied, bringing pressure from 265 to 300 psi (Liza).
Signs of RFI in channels S5, S6 (overflow) pretty much all the time (Liza)
Racbus lost connection with newsmerd 2 times, the pcal control had to be returned to fs manually (calu…) Caused overflow of all VCs (Liza)
11:45 He supply pressure ~278 psi. Dropping at this rate it should be below 275 psi in about an hour or two. Liza will contact Brett and he will make decision (Anita)
A little after 14:00 UT Brett re-filled the He-supply, now is about 298 psi. (Ellen)
Katherine
Disk VSN: MED-0020/2000
Start Pos: 0 GB
Yarragadee
Disk VSN: USN-0201/2000
Start Pos: 0 GB