R4689

Achtung! R1 TRANSFER IN PROGRESS! MONITORING REQUIRED!

R1 monitoring instructions: operations:monitoring.ivs.etransfer

R1 Transfer behaved the entire time and looks like it finished happy. (Ellen)

UT 08:22: Pointings good for all 3 telescopes (JS)

UT 08:38: Fringes found in both(?) bands for all 3 telescopes (JS)

Hobart 12m:

Disk VSN: HOB+1003/8000/1024

Data volume at beginning: 5052.945 GB

Katherine 12m:

Telescope was involved in a survey recently, check extra carefully everything is ok.Ryan will be there in the morning Thursday sometime (might be early). Mick can go out to the telescope up until Friday lunchtime.(Brett via Anita)

Disk VSN: BKG-0049/2000

Data volume at beginning: 1.218 GB

Experiment started OK

Maser was very slowly drifting over the course for the 24 hours displayed, but stayed between -0.295 and -0.325. (Ellen)

Yarragadee 12m:

Disk VSN:UVLBI-13/2000

Data volume at beginning: 0.513 GB

UT 18:31 Waiting at limit at start of experiment, missed scan 148-1830b (JS)

Note: IF values were at S-RCP 15, X-LCP 7 I reset these to the nominal S-RCP 10 X-LCP 7 and the attenuations seem fine

e-control wasn't connecting but the new one (that we haven't used for aaaages) connects fine :-|