Chair: Lim
Attended: Momtaz Simin, Mas, Tiege, Patrick, Jamie, Katie
Apologies: Ross, Earl, Jay, Lucas
Absent:
General Issues
Please remember to create handover note page during setup.
No connection to Yg and Hb maser.
Go to pcfs terminate the e remote control and restart if cannot connect.
End message, if problem exists, please mention/describe the error.
Handover Issues
R4892:
Handover note created without experiment name.
“Experiment started” information not provided.
Data volume at beginning not specified.
CRD102:
Ho: 1307UT - fmset puts the field system time 6.2 seconds ahead of the Mark5 and Computer time, this seems to result in scans ending (and starting) ~5 seconds ahead of schedule (when going off the log time). We are in the last 50 mins of the experiment so I am going to leave as is rather than spend 25 mins restarting machines and end up losing more data than would be (potentially) saved. (Tiege)
R1894:
AOV035:
Ho: 1725UT - Cryo monitoring system not working at Ho (ERROR ma -4 Device rx timed-out on response). I have replaced the cryomon and rxmon procedures with nops in EXPERIMENT procedure library for the time being, because otherwise it waits for each rx measurement to time out. I have also commented out the rxmon command in the midob procedure in STATION library, as that is also waiting for timeout, and screwing up scan timing. (Patrick)
1725UT - wx command not working. (Patrick)
Path failure.
Ups failed (lost power)
Working now.